Box Canyon Dam
In 1952, the Pend Oreille Public Utility District (the District) commissioned construction of the Box Canyon Dam as the centerpiece of its Box Canyon Hydroelectric Project. Including the spillway, the dam is 500 feet long and over 62 feet high. ...