Results for Construction of Fire Control Tower No. 23
Results for Construction of Fire Control Tower No. 23
Construction of Fire Control Tower No. 23
White Construction of New York was the contractor for this fire control tower. They used a “sliding form” or “slip form,” allowing for a continuous pour of concrete. In June of 1942, about fourteen piles were driven into the ground. ...
photo_library