Results for Fire Control Tower No. 23
Construction of Fire Control Tower No. 23
White Construction of New York was the contractor for this fire control tower. They used a “sliding form” or “slip form,” allowing for a continuous pour of concrete. In June of 1942, about fourteen piles were driven into the ground. ...
photo_library
Fire Control Tower No. 23
This tower was built to house a sophisticated system for aiming the guns of Fort Miles. From Fire Control Towers along the coast, soldiers would determine the exact location of an enemy ship using the geometric principle of triangulation. Each ...