Abingdon Plantation Restoration
The Metropolitan Washington Airports Authority worked in concert with Federal, state and local historic preservation agencies and professionals in the field to develop the restoration plan for the Abingdon Plantation site. The restoration process involved:
• careful excavation and cataloguing of all archaeological features below ground
• repairs to the original brick foundations, retaining as much of the original building material as possible
• restoring unstable portions of the original foundations using new building materials
• providing new above-ground reconstructions of previously buried ruin features