First Erosion Control Work in the Southeast

On Dec. 18, 1933, work began on the J.L. Berry Gully, 1.5 miles S.E. as part of the South Tyger River Erosion Control Demonstration Project by the USDI Soil Erosion Service, Dr. T.S. Bule, Project Director. This project was a forerunner of the USDA Soil Conservation Service and the Soil and Water Conservation Districts.

Marker is on State Highway 417 near Bethany Church Road, on the left when traveling south.

Courtesy hmdb.org

Credits and Sources:

HMDB